LAKE GEORGE FACTS – Separating Facts from Fiction

The  PINHOLE  Exposed ……   The  PINHOLE IN THE  BATH TUB  according to  The Lake George  Park  Commission that is.

A  FOIL  Request has been  made on more than one occasion  to the  State of  New  York  regarding  the  WINTER TIME  DRAW-DOWNS   and  the  PINHOLE in The Bath Tub.

Alexandria  Street Bridge at Weedville  ONE  SINGLE  DRAIN HOLE for Lake George

a-dam-alexandria

Alexandria  Street Bridge at Weedville  ONE  SINGLE  DRAIN HOLE for Lake George

MillPond

The  Dam  Release  Spillway has been inspected by the  US  ARMY’s  ENGINEERS  and  the  New York State’s  Engineers as well  revealing the  Dam is  54%  Inadequate to handle  Flood  Stage  Spring  Runoffs ……    THUS  the  State  Implements    WINTER TIME  DRAW-DOWN …..    Certain  Dock and  Boathouse and  Shoreline  REPAIR  Companies  and  the  State makes  LOTS of  Money  from the  ICE  DAMAGE.

 

Aabsouluteproof

LaChutePinHole

242  Square Miles of Watershed and the  Winter Snow and Ice  Melt  all must pass through that  ONE PINHOLE at  WEEDVILLE

alakedamage

LAKE  DRAW-DOWN   and  the  PINHOLE  (  Alexandria  Street  Bridge )   Explained

DrawDown

LAKE  DRAW-DOWN   and  the  PINHOLE  (  Alexandria  Street  Bridge )   Explained

DamAReport

    The  Lake  George  Association  and  the  Darrin  Freshwater Institute  with  RPI and  Queensbury  with  Warren County and  the  State of  New  York  are  HAWKING  Septic  Tank  Technologies   BECAUSE  They  KNOW  the  Lake is  a  LARGE  STONE  BASIN  and  the  “AA”  Clean Water  Rating …..  well  that’s  a  JOKE.   Large Amounts  of  SEWAGE  RUN OFF  contaminates  Lake George  and has for  DECADES.    The Reality of  Lake  George  SEPTIC  and  SEWAGE  Run Off is something it seems  THEY WANT TO SEPARATE  from  Their  Version of  Their So Called  FACTS.

For an INDEPTH Historical Look at the REAL RECORDS ….. Here are Those Historical Records

PileOCrap

 

 

 

 

Leave a comment